SSaLT Results for Live Oak Park Community Center (4786)
Room Surveyed:  Live Oak 1
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed

Cellular results pending load test.


Uploaded Files
File Description Upload Date Uploaded By
Room Picture1/19/2022Patrick Igoe
Diagram1/19/2022Patrick Igoe

A Load Test has not been completed for this location.


Last Used (Election)
Assembly District 49 Special Primary Election

 
ePulse Download Results
Carrier Result

ePulse results pending load test.


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 54
Max BMDs Supported (outlets) 10
Max ePollBooks Supported Pending Load Test
Site Survey Result Failed
Load Test Status Pending
Load Test Date  
Cellular Result
Ethernet Result


Electrical Survey Summary
Description Value
Electrical Survey Date 1/19/2022
Available Amperage 48.00
Number of Working Outlets 4
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets
2 Prong (Type A) 20 Amp Outlets
3 Prong (Type B) 15 Amp Outlets
3 Prong (Type B) 20 Amp Outlets
Electrical Surveyor Patrick Igoe