SSaLT Results for Los Angeles Trade Technical College (7658)
Room Surveyed: Laurel Gymnasium
Cellular Measurements from Load Test
| Carrier | Upload Speed | Download Speed |
|---|---|---|
| FirstNet 5G | 19.35 | 14.19 |
| T-Mobile 5G | 8.70 | 74.87 |
| Verizon 5G | 22.61 | 70.22 |
| Ethernet (Speeds) | 905.56 | 187.33 |
| Ethernet (Port) | 1 | |
Uploaded Files
| File Description | Upload Date | Uploaded By |
|---|---|---|
| Room Picture | 4/30/2022 | Patrick Igoe |
| Diagram | 4/30/2022 | Patrick Igoe |
| Data Jack - IDF-G104-100-3 | 3/17/2026 |
Last Used (Election)
| March 2024 Presidential Primary Election |
ePulse Download Results
| Carrier | Result |
|---|---|
| AT&T | Successful |
| T-Mobile 5G | Successful |
| Verizon 5G | Successful |
| Ethernet (WAN) | Successful |
Changes to Electrical
Add GeneratorAdd Spider Box
SSaLT Summary
| Description | Quantity |
|---|---|
| Max BMDs Supported (power) | 68 |
| Max BMDs Supported (outlets) | 68 |
| Max ePollBooks Supported | 32 |
| Site Survey Result | Passed |
| Load Test Status | Completed |
| Load Test Date | 3/17/2026 |
| Cellular Result | Cell (6) |
| Ethernet Result | Successful |
Electrical Survey Summary
| Description | Value |
|---|---|
| Electrical Survey Date | 4/29/2022 |
| Available Amperage | 60.00 |
| Number of Working Outlets | 16 |
| Number of Dead Outlets | 0 |
| 2 Prong (Type A) 15 Amp Outlets | |
| 2 Prong (Type A) 20 Amp Outlets | |
| 3 Prong (Type B) 15 Amp Outlets | |
| 3 Prong (Type B) 20 Amp Outlets | |
| Electrical Surveyor | Patrick Igoe |