SSaLT Results for 4th Street Elementary School (12765)
Room Surveyed:  Auditorium
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed

Cellular results pending load test.


Uploaded Files
File Description Upload Date Uploaded By
Room Picture10/10/2022Patrick Igoe
Diagram10/10/2022Patrick Igoe

A Load Test has not been completed for this location.


Last Used (Election)
2022 Statewide General Election

 
ePulse Download Results
Carrier Result

ePulse results pending load test.


Changes to Electrical
Remove Generator
Remove Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 22
Max BMDs Supported (outlets) 5
Max ePollBooks Supported Pending Load Test
Site Survey Result Mitigation Needed
Remediation Generator Required
Remediation Spider Box Required
Load Test Status Pending
Load Test Date  
Cellular Result
Ethernet Result


Electrical Survey Summary
Description Value
Electrical Survey Date 10/7/2022
Available Amperage 20.00
Number of Working Outlets 3
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets
2 Prong (Type A) 20 Amp Outlets
3 Prong (Type B) 15 Amp Outlets
3 Prong (Type B) 20 Amp Outlets
Electrical Surveyor Patrick Igoe