SSaLT Results for Diamond Bar Center (13903)
Room Surveyed: Grand Ballroom
Cellular Measurements from Load Test
Carrier | Upload Speed | Download Speed | |
---|---|---|---|
Cellular results pending load test. |
Uploaded Files
File Description | Upload Date | Uploaded By |
---|---|---|
Room Picture | 8/3/2023 | Keith Ferguson |
Diagram | 8/3/2023 | Keith Ferguson |
A Load Test has not been completed for this location. | ||
Last Used (Election)
March 2024 Presidential Primary Election |
ePulse Download Results
Carrier | Result |
---|---|
ePulse results pending load test. |
Changes to Electrical
Add GeneratorAdd Spider Box
SSaLT Summary
Description | Quantity |
---|---|
Max BMDs Supported (power) | 205 |
Max BMDs Supported (outlets) | 205 |
Max ePollBooks Supported | Pending Load Test |
Site Survey Result | Passed |
Load Test Status | Pending |
Load Test Date | |
Cellular Result | |
Ethernet Result |
Electrical Survey Summary
Description | Value |
---|---|
Electrical Survey Date | 8/2/2023 |
Available Amperage | 180.00 |
Number of Working Outlets | 80 |
Number of Dead Outlets | 26 |
2 Prong (Type A) 15 Amp Outlets | 0 |
2 Prong (Type A) 20 Amp Outlets | 0 |
3 Prong (Type B) 15 Amp Outlets | 40 |
3 Prong (Type B) 20 Amp Outlets | 40 |
Electrical Surveyor | Keith Ferguson |