SSaLT Results for LA County Department of Public Works (13946)
Room Surveyed:  Conference Rooms A B and C
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed
FirstNet 6.52 19.08
T-Mobile LTE 0.80 5.68
Verizon 2.32 11.92
T-Mobile 5G 0.98 15.36
Verizon 5G 1.35 42.54
Ethernet (Speeds) 135.08 193.35
Ethernet (Port) 1003


Uploaded Files
File Description Upload Date Uploaded By
Room Picture9/8/2023Keith Ferguson
Diagram9/8/2023Keith Ferguson
Data Jack8/16/2022


Last Used (Election)
March 2024 Presidential Primary Election

 
ePulse Download Results
Carrier Result
AT&T Successful
T-Mobile Not Tested
Verizon Not Tested
Not Tested
T-Mobile 5G Not Tested
Verizon 5G Not Tested
Ethernet (WAN) Successful


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 137
Max BMDs Supported (outlets) 60
Max ePollBooks Supported 6
Site Survey Result Passed
Load Test Status Completed
Load Test Date 8/16/2022
Cellular Result Cell (1)
Ethernet Result Successful


Electrical Survey Summary
Description Value
Electrical Survey Date 9/7/2023
Available Amperage 120.00
Number of Working Outlets 14
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 14
3 Prong (Type B) 20 Amp Outlets 0
Electrical Surveyor Keith Ferguson