SSaLT Results for Quartz Hill Library (13269)
Room Surveyed:  Meeting Room
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed

Cellular results pending load test.


Uploaded Files
File Description Upload Date Uploaded By
Room Picture10/23/2023Franklin Scott
Diagram10/23/2023Franklin Scott
Room Picture10/23/2023Franklin Scott
Diagram10/23/2023Franklin Scott

A Load Test has not been completed for this location.


Last Used (Election)
March 2020 Presidential Primary Election

 
ePulse Download Results
Carrier Result

ePulse results pending load test.


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 251
Max BMDs Supported (outlets) 85
Max ePollBooks Supported Pending Load Test
Site Survey Result Passed
Load Test Status Pending
Load Test Date  
Cellular Result
Ethernet Result


Electrical Survey Summary
Description Value
Electrical Survey Date 10/23/2023
Available Amperage 80.00
Number of Working Outlets 19
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 18
3 Prong (Type B) 20 Amp Outlets 1
Electrical Surveyor Franklin Scott