SSaLT Results for Salon Luz de Luna (24555)
Room Surveyed:  Hall
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed

Cellular results pending load test.


Uploaded Files
File Description Upload Date Uploaded By
Room Picture12/5/2023Eliah Ostrander
Diagram12/5/2023Eliah Ostrander

A Load Test has not been completed for this location.


Last Used (Election)
March 2024 Presidential Primary Election

 
ePulse Download Results
Carrier Result

ePulse results pending load test.


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 136
Max BMDs Supported (outlets) 136
Max ePollBooks Supported Pending Load Test
Site Survey Result Passed
Load Test Status Pending
Load Test Date  
Cellular Result
Ethernet Result


Electrical Survey Summary
Description Value
Electrical Survey Date 12/4/2023
Available Amperage 119.30
Number of Working Outlets 44
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 28
3 Prong (Type B) 20 Amp Outlets 15
Electrical Surveyor Eliah Ostrander