SSaLT Results for Echo Park Branch Library (160)
Room Surveyed: 203 Multipurpose Room
Cellular Measurements from Load Test
| Carrier | Upload Speed | Download Speed |
|---|---|---|
| FirstNet | 18.63 | 137.39 |
| T-Mobile LTE | 24.84 | 15.42 |
| Verizon | 17.52 | 60.91 |
| T-Mobile 5G | 44.18 | 13.57 |
| Verizon 5G | 72.10 | 92.43 |
| Ethernet (Speeds) | 313.98 | 247.87 |
| Ethernet (Port) | CR-01-01 | |
Uploaded Files
| File Description | Upload Date | Uploaded By |
|---|---|---|
| Room Picture | 12/8/2023 | Franklin Scott |
| Diagram | 12/8/2023 | Franklin Scott |
| Data Jack | 12/7/2023 |
Last Used (Election)
| November 2024 General Election |
ePulse Download Results
| Carrier | Result |
|---|---|
| AT&T | Successful |
| T-Mobile | Not Tested |
| Verizon | Not Tested |
| Not Tested | |
| T-Mobile 5G | Not Tested |
| Verizon 5G | Not Tested |
| Ethernet (WAN) | Successful |
Changes to Electrical
Add GeneratorAdd Spider Box
SSaLT Summary
| Description | Quantity |
|---|---|
| Max BMDs Supported (power) | 68 |
| Max BMDs Supported (outlets) | 50 |
| Max ePollBooks Supported | 46 |
| Site Survey Result | Passed |
| Load Test Status | Completed |
| Load Test Date | 12/7/2023 |
| Cellular Result | Cell (5) |
| Ethernet Result | Successful |
Electrical Survey Summary
| Description | Value |
|---|---|
| Electrical Survey Date | 12/7/2023 |
| Available Amperage | 60.00 |
| Number of Working Outlets | 12 |
| Number of Dead Outlets | 0 |
| 2 Prong (Type A) 15 Amp Outlets | 0 |
| 2 Prong (Type A) 20 Amp Outlets | 0 |
| 3 Prong (Type B) 15 Amp Outlets | 0 |
| 3 Prong (Type B) 20 Amp Outlets | 12 |
| Electrical Surveyor | Franklin Scott |