SSaLT Results for Boys and Girls Club of Ramona Gardens (548)
Room Surveyed:  Gymnasium
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed

Cellular results pending load test.


Uploaded Files
File Description Upload Date Uploaded By
Room Picture12/18/2023Franklin Scott
Diagram12/18/2023Franklin Scott

A Load Test has not been completed for this location.


Last Used (Election)
March 2024 Presidential Primary Election

 
ePulse Download Results
Carrier Result

ePulse results pending load test.


Changes to Electrical
Remove Generator
Remove Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 18
Max BMDs Supported (outlets) 0
Max ePollBooks Supported Pending Load Test
Site Survey Result Mitigation Needed
Remediation Generator Required
Remediation Spider Box Required
Load Test Status Pending
Load Test Date  
Cellular Result
Ethernet Result


Electrical Survey Summary
Description Value
Electrical Survey Date 12/15/2023
Available Amperage 16.00
Number of Working Outlets 2
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 2
3 Prong (Type B) 20 Amp Outlets 0
Electrical Surveyor Franklin Scott