SSaLT Results for CA State Polytechnic University Pomona (11786)
Room Surveyed:  Building 35 Room 2135 Ursa Minor
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed
FirstNet 5G 10.96 164.19
T-Mobile 5G 10.14 111.76
Verizon 5G 5.83 48.19
Ethernet (Speeds) 569.25 129.95
Ethernet (Port) D-B


Uploaded Files
File Description Upload Date Uploaded By
Room Picture9/25/2024Eliah Ostrander
Diagram9/25/2024Eliah Ostrander

A file has not been uploaded for this load test.


Last Used (Election)
2022 Statewide General Election

 
ePulse Download Results
Carrier Result
AT&T Successful
T-Mobile 5G Successful
Verizon 5G Successful
Ethernet (WAN) Successful


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 156
Max BMDs Supported (outlets) 140
Max ePollBooks Supported 10
Site Survey Result Passed
Load Test Status Completed
Load Test Date 9/27/2024
Cellular Result Cell (3)
Ethernet Result Successful


Electrical Survey Summary
Description Value
Electrical Survey Date 9/24/2024
Available Amperage 137.00
Number of Working Outlets 30
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 20
3 Prong (Type B) 20 Amp Outlets 10
Electrical Surveyor Eliah Ostrander