SSaLT Results for CA State Polytechnic University Pomona (11786)
Room Surveyed: Building 35 Room 2135 Ursa Minor
Cellular Measurements from Load Test
Carrier | Upload Speed | Download Speed |
---|---|---|
FirstNet 5G | 10.96 | 164.19 |
T-Mobile 5G | 10.14 | 111.76 |
Verizon 5G | 5.83 | 48.19 |
Ethernet (Speeds) | 569.25 | 129.95 |
Ethernet (Port) | D-B |
Uploaded Files
File Description | Upload Date | Uploaded By |
---|---|---|
Room Picture | 9/25/2024 | Eliah Ostrander |
Diagram | 9/25/2024 | Eliah Ostrander |
A file has not been uploaded for this load test. | ||
Last Used (Election)
2022 Statewide General Election |
ePulse Download Results
Carrier | Result |
---|---|
AT&T | Successful |
T-Mobile 5G | Successful |
Verizon 5G | Successful |
Ethernet (WAN) | Successful |
Changes to Electrical
Add GeneratorAdd Spider Box
SSaLT Summary
Description | Quantity |
---|---|
Max BMDs Supported (power) | 156 |
Max BMDs Supported (outlets) | 140 |
Max ePollBooks Supported | 10 |
Site Survey Result | Passed |
Load Test Status | Completed |
Load Test Date | 9/27/2024 |
Cellular Result | Cell (3) |
Ethernet Result | Successful |
Electrical Survey Summary
Description | Value |
---|---|
Electrical Survey Date | 9/24/2024 |
Available Amperage | 137.00 |
Number of Working Outlets | 30 |
Number of Dead Outlets | 0 |
2 Prong (Type A) 15 Amp Outlets | 0 |
2 Prong (Type A) 20 Amp Outlets | 0 |
3 Prong (Type B) 15 Amp Outlets | 20 |
3 Prong (Type B) 20 Amp Outlets | 10 |
Electrical Surveyor | Eliah Ostrander |