SSaLT Results for Garvey Center (11784)
Room Surveyed:  Frank G Tripepi Room
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed
FirstNet 5G 0.0 0.0
T-Mobile 5G 0.0 0.0
Verizon 5G 2.0 39.0
Ethernet (Speeds) 0.0 0.0
Ethernet (Port) Admin area under desk


Uploaded Files
File Description Upload Date Uploaded By
Room Picture2/12/2026Patrick Igoe
Diagram2/12/2026Patrick Igoe
Port 28/31/2026
HL Port 48/31/2026


Last Used (Election)
November 2025 Statewide Special Election

 
ePulse Download Results
Carrier Result
AT&T Failed
T-Mobile 5G Failed
Verizon 5G Successful
Ethernet (WAN) Not Tested


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 114
Max BMDs Supported (outlets) 70
Max ePollBooks Supported 15
Site Survey Result Passed
Load Test Status Completed
Load Test Date 8/31/2026
Cellular Result Cell (1)
Ethernet Result Not Tested


Electrical Survey Summary
Description Value
Electrical Survey Date 2/11/2026
Available Amperage 100.00
Number of Working Outlets 16
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 14
3 Prong (Type B) 20 Amp Outlets 2
Electrical Surveyor Patrick Igoe