SSaLT Results for Norwalk La Mirada Adult School (14418)
Room Surveyed:  Multi-Purpose Room
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed
FirstNet 5G 17.83 148.92
T-Mobile 5G 0.0 0.0
Verizon 5G 1.60 36.82
Ethernet (Speeds) 0.0 0.0
Ethernet (Port) N/A No HL


Uploaded Files
File Description Upload Date Uploaded By
Room Picture2/23/2026Rafael Meza
Diagram2/23/2026Rafael Meza

A file has not been uploaded for this load test.


Last Used (Election)
Norwalk-La Mirada Unified School District Special Election

 
ePulse Download Results
Carrier Result
AT&T Failed
T-Mobile 5G Failed
Verizon 5G Successful
Ethernet (WAN) Internet Not Tested


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 68
Max BMDs Supported (outlets) 68
Max ePollBooks Supported 17
Site Survey Result Passed
Load Test Status Completed
Load Test Date 2/20/2026
Cellular Result Cell (4)
Ethernet Result Internet Not Tested


Electrical Survey Summary
Description Value
Electrical Survey Date 2/20/2026
Available Amperage 60.00
Number of Working Outlets 34
Number of Dead Outlets 4
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 10
3 Prong (Type B) 20 Amp Outlets 24
Electrical Surveyor Rafael Meza