SSaLT Results for Northeast Valley Multipurpose Sr Center (7762)
Room Surveyed:  Multi-Purpose Room
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed
FirstNet 5G 0.48 3.70
T-Mobile 5G 0.0 0.0
Verizon 5G 0.0 0.0
Ethernet (Speeds) 0.0 0.0
Ethernet (Port) n/a


Uploaded Files
File Description Upload Date Uploaded By
Room Picture2/27/2026John Navarrete
Diagram2/27/2026John Navarrete

A file has not been uploaded for this load test.


Last Used (Election)
November 2025 Statewide Special Election

 
ePulse Download Results
Carrier Result
AT&T Not Tested
T-Mobile 5G Not Tested
Verizon 5G Not Tested
Ethernet (WAN) Internet Not Tested


Changes to Electrical
Add Generator
Remove Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 21
Max BMDs Supported (outlets) 21
Max ePollBooks Supported 0
Site Survey Result Mitigation Needed
Remediation Spider Box Required
Load Test Status Completed
Load Test Date 2/27/2026
Cellular Result Cell (0)
Ethernet Result Internet Not Tested


Electrical Survey Summary
Description Value
Electrical Survey Date 2/26/2026
Available Amperage 19.10
Number of Working Outlets 10
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 10
3 Prong (Type B) 20 Amp Outlets 0
Electrical Surveyor John Navarrete