SSaLT Results for Stonehurst Recreation Center (17742)
Room Surveyed:  Preschool Building
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed
FirstNet 5G 23.01 254.48
T-Mobile 5G 18.84 135.37
Verizon 5G 1.34 105.88
Ethernet (Speeds) 0.0 0.0
Ethernet (Port) N/A No HL


Uploaded Files
File Description Upload Date Uploaded By
Room Picture4/10/2026Widmar Zepeda
Diagram4/10/2026Widmar Zepeda

A file has not been uploaded for this load test.


Last Used (Election)
November 2025 Statewide Special Election

 
ePulse Download Results
Carrier Result
AT&T Successful
T-Mobile 5G Successful
Verizon 5G Successful
Ethernet (WAN) Not Tested


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 43
Max BMDs Supported (outlets) 20
Max ePollBooks Supported 18
Site Survey Result Passed
Load Test Status Completed
Load Test Date 4/2/2026
Cellular Result Cell (5)
Ethernet Result Not Tested


Electrical Survey Summary
Description Value
Electrical Survey Date 3/6/2026
Available Amperage 37.70
Number of Working Outlets 6
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 6
3 Prong (Type B) 20 Amp Outlets 0
Electrical Surveyor Widmar Zepeda