SSaLT Results for Pan Pacific Senior Activity Center (2053)
Room Surveyed:  Multipurpose Room 102
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed
FirstNet 5G 2.55 184.31
T-Mobile 5G 0.71 0.53
Verizon 5G 3.73 135.67
Ethernet (Speeds) 0.0 0.0
Ethernet (Port) West wall


Uploaded Files
File Description Upload Date Uploaded By
Room Picture4/10/2026Rafael Meza
Diagram4/10/2026Rafael Meza
STA-14/2/2026


Last Used (Election)
2022 Statewide Direct Primary Election

 
ePulse Download Results
Carrier Result
AT&T Successful
T-Mobile 5G Successful
Verizon 5G Successful
Ethernet (WAN) Not Tested


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 91
Max BMDs Supported (outlets) 91
Max ePollBooks Supported 0
Site Survey Result Passed
Load Test Status Completed
Load Test Date 4/2/2026
Cellular Result Cell (0)
Ethernet Result Not Tested


Electrical Survey Summary
Description Value
Electrical Survey Date 4/2/2026
Available Amperage 80.00
Number of Working Outlets 32
Number of Dead Outlets 1
2 Prong (Type A) 15 Amp Outlets 2
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 16
3 Prong (Type B) 20 Amp Outlets 4
Electrical Surveyor Rafael Meza