SSaLT Results for Ted Watkins Memorial Park (2329)
Room Surveyed:  Gymnasium
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed
FirstNet 5G 1.00 1.97
T-Mobile 5G 26.24 7.43
Verizon 5G 13.15 19.15
Ethernet (Speeds) 14.47 35.38
Ethernet (Port) MDF in Office NW Corner Port 11


Uploaded Files
File Description Upload Date Uploaded By
Room Picture4/8/2026John Navarrete
Diagram4/8/2026John Navarrete
Location 29/4/2026


Last Used (Election)
March 2024 Presidential Primary Election

 
ePulse Download Results
Carrier Result
AT&T Not Tested
T-Mobile 5G Not Tested
Verizon 5G Not Tested
Ethernet (WAN) Not Tested


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 67
Max BMDs Supported (outlets) 60
Max ePollBooks Supported 11
Site Survey Result Passed
Load Test Status Completed
Load Test Date 9/3/2026
Cellular Result Cell (2)
Ethernet Result Not Tested


Electrical Survey Summary
Description Value
Electrical Survey Date 4/7/2026
Available Amperage 58.90
Number of Working Outlets 14
Number of Dead Outlets 2
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 14
3 Prong (Type B) 20 Amp Outlets 0
Electrical Surveyor John Navarrete