SSaLT Results for Early Childhood Education Center (15015)
Room Surveyed:  Building N
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed
FirstNet 5G 11.12 140.40
T-Mobile 5G 23.90 15.65
Verizon 5G 20.97 23.24
Ethernet (Speeds) 79.24 60.98
Ethernet (Port) East wall, near SE corner


Uploaded Files
File Description Upload Date Uploaded By
Room Picture4/23/2026Widmar Zepeda
Diagram4/23/2026Widmar Zepeda
K-D-483/17/2026
K-D-1483/17/2026


Last Used (Election)
November 2024 General Election

 
ePulse Download Results
Carrier Result
AT&T Successful
T-Mobile 5G Successful
Verizon 5G Successful
Ethernet (WAN) Successful


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 38
Max BMDs Supported (outlets) 38
Max ePollBooks Supported 13
Site Survey Result Passed
Load Test Status Completed
Load Test Date 3/17/2026
Cellular Result Cell (6)
Ethernet Result Successful


Electrical Survey Summary
Description Value
Electrical Survey Date 4/22/2026
Available Amperage 33.50
Number of Working Outlets 24
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 0
3 Prong (Type B) 20 Amp Outlets 24
Electrical Surveyor Widmar Zepeda