SSaLT Results for LBCC Trades-Tech-Comm Learning Campus (19595)
Room Surveyed:  Room GG238
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed
FirstNet 5G 6.61 163.93
T-Mobile 5G 15.71 109.57
Verizon 5G 1.25 14.98
Ethernet (Speeds) 0.0 0.0
Ethernet (Port) SW Corner Behind Podium Use Bottom Left Pic


Uploaded Files
File Description Upload Date Uploaded By
Room Picture8/24/2026Rafael Meza
Diagram8/24/2026Rafael Meza
Location 2 8/21/2026


Last Used (Election)
November 2024 General Election

 
ePulse Download Results
Carrier Result
AT&T Not Tested
T-Mobile 5G Not Tested
Verizon 5G Not Tested
Ethernet (WAN) Not Tested


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 137
Max BMDs Supported (outlets) 130
Max ePollBooks Supported 15
Site Survey Result Passed
Load Test Status Completed
Load Test Date 8/21/2026
Cellular Result Cell (3)
Ethernet Result Not Tested


Electrical Survey Summary
Description Value
Electrical Survey Date 8/21/2026
Available Amperage 120.00
Number of Working Outlets 28
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 0
3 Prong (Type B) 20 Amp Outlets 28
Electrical Surveyor Rafael Meza