SSaLT Results for Valley Korean United Methodist Church (13696)
Room Surveyed:  Education Building Lobby
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed
FirstNet 5G 27.07 290.66
T-Mobile 5G 50.65 145.26
Verizon 5G 25.56 125.00
Ethernet (Speeds) 40.08 92.90
Ethernet (Port) Located inside Room 101 on West Wall


Uploaded Files
File Description Upload Date Uploaded By
Room Picture9/17/2026Jefferey Castillo
Diagram9/17/2026Jefferey Castillo
Data Jack Location 9/16/2026


Last Used (Election)
March 2020 Presidential Primary Election

 
ePulse Download Results
Carrier Result
AT&T Not Tested
T-Mobile 5G Not Tested
Verizon 5G Not Tested
Ethernet (WAN) Successful


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 45
Max BMDs Supported (outlets) 10
Max ePollBooks Supported 50
Site Survey Result Failed
Load Test Status Completed
Load Test Date 9/16/2026
Cellular Result Cell (6)
Ethernet Result Successful


Electrical Survey Summary
Description Value
Electrical Survey Date 9/16/2026
Available Amperage 40.00
Number of Working Outlets 4
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 4
3 Prong (Type B) 20 Amp Outlets 0
Electrical Surveyor Jefferey Castillo