SSaLT Results for Stonehurst Recreation Center (17742)
Room Surveyed:  Preschool Building
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed
FirstNet 5G 23.01 254.48
T-Mobile 5G 18.84 135.37
Verizon 5G 1.34 105.88
Ethernet (Speeds) 0.0 0.0
Ethernet (Port) N/A No HL


Uploaded Files
File Description Upload Date Uploaded By
Room Picture3/24/2022Patrick Igoe
Diagram3/24/2022Patrick Igoe

A file has not been uploaded for this load test.


Last Used (Election)
November 2025 Statewide Special Election

 
ePulse Download Results
Carrier Result
AT&T Successful
T-Mobile 5G Successful
Verizon 5G Successful
Ethernet (WAN) Not Tested


Changes to Electrical
Remove Generator
Remove Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 18
Max BMDs Supported (outlets) 0
Max ePollBooks Supported 18
Site Survey Result Mitigation Needed
Remediation Generator Required
Remediation Spider Box Required
Load Test Status Completed
Load Test Date 4/2/2026
Cellular Result Cell (5)
Ethernet Result Not Tested


Electrical Survey Summary
Description Value
Electrical Survey Date 3/22/2022
Available Amperage 16.00
Number of Working Outlets 2
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets
2 Prong (Type A) 20 Amp Outlets
3 Prong (Type B) 15 Amp Outlets
3 Prong (Type B) 20 Amp Outlets
Electrical Surveyor Patrick Igoe