SSaLT Results for El Monte Station of LA Metro (13395)
Room Surveyed:  Retail Space
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed

Cellular results pending load test.


Uploaded Files
File Description Upload Date Uploaded By
Room Picture4/5/2022Giovanni Carro
Diagram4/5/2022Giovanni Carro

A Load Test has not been completed for this location.


Last Used (Election)
2022 Statewide General Election

 
ePulse Download Results
Carrier Result

ePulse results pending load test.


Changes to Electrical
Add Generator
Remove Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 64
Max BMDs Supported (outlets) 5
Max ePollBooks Supported Pending Load Test
Site Survey Result Mitigation Needed
Remediation Spider Box Required
Load Test Status Pending
Load Test Date  
Cellular Result
Ethernet Result


Electrical Survey Summary
Description Value
Electrical Survey Date 4/1/2022
Available Amperage 56.00
Number of Working Outlets 3
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets
2 Prong (Type A) 20 Amp Outlets
3 Prong (Type B) 15 Amp Outlets
3 Prong (Type B) 20 Amp Outlets
Electrical Surveyor Giovanni Carro