SSaLT Results for Proto-Cathedral of St Mary (8762)
Room Surveyed: Conference Hall
Cellular Measurements from Load Test
Carrier | Upload Speed | Download Speed | |
---|---|---|---|
Cellular results pending load test. |
Uploaded Files
File Description | Upload Date | Uploaded By |
---|---|---|
Room Picture | 9/28/2022 | Patrick Igoe |
Diagram | 9/28/2022 | Patrick Igoe |
A Load Test has not been completed for this location. | ||
Last Used (Election)
2022 Statewide General Election |
ePulse Download Results
Carrier | Result |
---|---|
ePulse results pending load test. |
Changes to Electrical
Add GeneratorAdd Spider Box
SSaLT Summary
Description | Quantity |
---|---|
Max BMDs Supported (power) | 45 |
Max BMDs Supported (outlets) | 30 |
Max ePollBooks Supported | Pending Load Test |
Site Survey Result | Passed |
Load Test Status | Pending |
Load Test Date | |
Cellular Result | |
Ethernet Result |
Electrical Survey Summary
Description | Value |
---|---|
Electrical Survey Date | 9/27/2022 |
Available Amperage | 40.00 |
Number of Working Outlets | 8 |
Number of Dead Outlets | 1 |
2 Prong (Type A) 15 Amp Outlets | |
2 Prong (Type A) 20 Amp Outlets | |
3 Prong (Type B) 15 Amp Outlets | |
3 Prong (Type B) 20 Amp Outlets | |
Electrical Surveyor | Patrick Igoe |