SSaLT Results for Beverly Hills City Hall (13573)
Room Surveyed: Municipal Gallery 2nd Floor
Cellular Measurements from Load Test
Carrier | Upload Speed | Download Speed |
---|---|---|
FirstNet 5G | 3.23 | 42.86 |
T-Mobile 5G | 35.13 | 94.35 |
Verizon 5G | 29.22 | 71.95 |
Ethernet (Speeds) | 836.32 | 281.27 |
Ethernet (Port) | 19 |
Uploaded Files
File Description | Upload Date | Uploaded By |
---|---|---|
Room Picture | 3/7/2023 | Patrick Igoe |
Diagram | 3/7/2023 | Patrick Igoe |
Port 19 | 9/16/2024 | |
Data Jack | 10/9/2024 |
Last Used (Election)
2022 Statewide General Election |
ePulse Download Results
Carrier | Result |
---|---|
AT&T | Successful |
T-Mobile 5G | Successful |
Verizon 5G | Successful |
Ethernet (WAN) | Successful |
Changes to Electrical
Add GeneratorAdd Spider Box
SSaLT Summary
Description | Quantity |
---|---|
Max BMDs Supported (power) | 114 |
Max BMDs Supported (outlets) | 50 |
Max ePollBooks Supported | 35 |
Site Survey Result | Passed |
Load Test Status | Completed |
Load Test Date | 9/16/2024 |
Cellular Result | Cell (2) |
Ethernet Result | Successful |
Electrical Survey Summary
Description | Value |
---|---|
Electrical Survey Date | 3/7/2023 |
Available Amperage | 100.00 |
Number of Working Outlets | 12 |
Number of Dead Outlets | 1 |
2 Prong (Type A) 15 Amp Outlets | |
2 Prong (Type A) 20 Amp Outlets | |
3 Prong (Type B) 15 Amp Outlets | |
3 Prong (Type B) 20 Amp Outlets | |
Electrical Surveyor | Patrick Igoe |