SSaLT Results for Diamond Bar Center (13903)
Room Surveyed:  Grand Ballroom
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed

Cellular results pending load test.


Uploaded Files
File Description Upload Date Uploaded By
Room Picture8/3/2023Keith Ferguson
Diagram8/3/2023Keith Ferguson

A Load Test has not been completed for this location.


Last Used (Election)
March 2024 Presidential Primary Election

 
ePulse Download Results
Carrier Result

ePulse results pending load test.


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 205
Max BMDs Supported (outlets) 205
Max ePollBooks Supported Pending Load Test
Site Survey Result Passed
Load Test Status Pending
Load Test Date  
Cellular Result
Ethernet Result


Electrical Survey Summary
Description Value
Electrical Survey Date 8/2/2023
Available Amperage 180.00
Number of Working Outlets 80
Number of Dead Outlets 26
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 40
3 Prong (Type B) 20 Amp Outlets 40
Electrical Surveyor Keith Ferguson