SSaLT Results for San Fernando Spanish SDA Church (13152)
Room Surveyed: Gymnasium
Cellular Measurements from Load Test
Carrier | Upload Speed | Download Speed |
---|---|---|
FirstNet 5G | 1.98 | 12.61 |
T-Mobile 5G | 8.43 | 8.08 |
Verizon 5G | 8.78 | 73.47 |
Ethernet (Speeds) | 0.0 | 0.0 |
Ethernet (Port) | A/N |
Uploaded Files
File Description | Upload Date | Uploaded By |
---|---|---|
Room Picture | 8/28/2023 | Keith Ferguson |
Diagram | 8/28/2023 | Keith Ferguson |
A file has not been uploaded for this load test. | ||
Last Used (Election)
March 2024 Presidential Primary Election |
ePulse Download Results
Carrier | Result |
---|---|
AT&T | Successful |
T-Mobile 5G | Successful |
Verizon 5G | Successful |
Ethernet (WAN) | Internet Not Tested |
Changes to Electrical
Add GeneratorAdd Spider Box
SSaLT Summary
Description | Quantity |
---|---|
Max BMDs Supported (power) | 91 |
Max BMDs Supported (outlets) | 80 |
Max ePollBooks Supported | 8 |
Site Survey Result | Passed |
Load Test Status | Completed |
Load Test Date | 8/21/2024 |
Cellular Result | Cell (1) |
Ethernet Result | Internet Not Tested |
Electrical Survey Summary
Description | Value |
---|---|
Electrical Survey Date | 8/28/2023 |
Available Amperage | 80.00 |
Number of Working Outlets | 18 |
Number of Dead Outlets | 0 |
2 Prong (Type A) 15 Amp Outlets | 0 |
2 Prong (Type A) 20 Amp Outlets | 0 |
3 Prong (Type B) 15 Amp Outlets | 18 |
3 Prong (Type B) 20 Amp Outlets | 0 |
Electrical Surveyor | Keith Ferguson |