SSaLT Results for Bixby Park (14870)
Room Surveyed:  Social Hall 1
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed

Cellular results pending load test.


Uploaded Files
File Description Upload Date Uploaded By
Room Picture9/8/2023Franklin Scott
Diagram9/8/2023Franklin Scott

A Load Test has not been completed for this location.


Last Used (Election)
March 2024 Presidential Primary Election

 
ePulse Download Results
Carrier Result

ePulse results pending load test.


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 68
Max BMDs Supported (outlets) 40
Max ePollBooks Supported Pending Load Test
Site Survey Result Passed
Load Test Status Pending
Load Test Date  
Cellular Result
Ethernet Result


Electrical Survey Summary
Description Value
Electrical Survey Date 9/7/2023
Available Amperage 60.00
Number of Working Outlets 10
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 10
3 Prong (Type B) 20 Amp Outlets 0
Electrical Surveyor Franklin Scott