SSaLT Results for Early Childhood Education Center (15015)
Room Surveyed:  Building N
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed
FirstNet 5G 11.12 140.40
T-Mobile 5G 23.90 15.65
Verizon 5G 20.97 23.24
Ethernet (Speeds) 79.24 60.98
Ethernet (Port) East wall, near SE corner


Uploaded Files
File Description Upload Date Uploaded By
Room Picture10/11/2023Patrick Igoe
Diagram10/11/2023Patrick Igoe
K-D-483/17/2026
K-D-1483/17/2026


Last Used (Election)
November 2024 General Election

 
ePulse Download Results
Carrier Result
AT&T Successful
T-Mobile 5G Successful
Verizon 5G Successful
Ethernet (WAN) Successful


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 68
Max BMDs Supported (outlets) 68
Max ePollBooks Supported 13
Site Survey Result Passed
Load Test Status Completed
Load Test Date 3/17/2026
Cellular Result Cell (6)
Ethernet Result Successful


Electrical Survey Summary
Description Value
Electrical Survey Date 10/10/2023
Available Amperage 60.00
Number of Working Outlets 26
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 0
3 Prong (Type B) 20 Amp Outlets 26
Electrical Surveyor Patrick Igoe