SSaLT Results for Second AME Church (8939)
Room Surveyed:  Fellowship Hall
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed

Cellular results pending load test.


Uploaded Files
File Description Upload Date Uploaded By
Room Picture11/10/2023Patrick Igoe
Diagram11/10/2023Patrick Igoe

A Load Test has not been completed for this location.


Last Used (Election)
March 2020 Presidential Primary Election

 
ePulse Download Results
Carrier Result

ePulse results pending load test.


Changes to Electrical
Remove Generator
Remove Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 0
Max BMDs Supported (outlets) 0
Max ePollBooks Supported Pending Load Test
Site Survey Result Mitigation Needed
Remediation Generator Required
Remediation Spider Box Required
Load Test Status Pending
Load Test Date  
Cellular Result
Ethernet Result


Electrical Survey Summary
Description Value
Electrical Survey Date 11/8/2023
Available Amperage 0.00
Number of Working Outlets 0
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 0
3 Prong (Type B) 20 Amp Outlets 0
Electrical Surveyor Patrick Igoe