SSaLT Results for PUC Lakeview Charter Academy (14629)
Room Surveyed:  Multi-Purpose Room
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed
FirstNet 5G 0.01 0.13
T-Mobile 5G 4.51 24.70
Verizon 5G 0.0 0.0
Ethernet (Speeds) 106.09 104.35
Ethernet (Port) Port 43


Uploaded Files
File Description Upload Date Uploaded By
Room Picture12/5/2023Franklin Scott
Diagram12/5/2023Franklin Scott
Port 438/8/2024


Last Used (Election)
March 2024 Presidential Primary Election

 
ePulse Download Results
Carrier Result
AT&T Failed
T-Mobile 5G Failed
Verizon 5G Not Tested
Ethernet (WAN) Successful


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 164
Max BMDs Supported (outlets) 90
Max ePollBooks Supported 52
Site Survey Result Passed
Load Test Status Completed
Load Test Date 8/8/2024
Cellular Result Cell (0)
Ethernet Result Successful


Electrical Survey Summary
Description Value
Electrical Survey Date 12/1/2023
Available Amperage 144.00
Number of Working Outlets 20
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 0
3 Prong (Type B) 20 Amp Outlets 20
Electrical Surveyor Franklin Scott