SSaLT Results for Armenian Cilicia Evangelical Church (12803)
Room Surveyed: Derian Hall
Cellular Measurements from Load Test
Carrier | Upload Speed | Download Speed | |
---|---|---|---|
Cellular results pending load test. |
Uploaded Files
File Description | Upload Date | Uploaded By |
---|---|---|
Room Picture | 1/10/2024 | Eliah Ostrander |
Diagram | 1/10/2024 | Eliah Ostrander |
A Load Test has not been completed for this location. | ||
Last Used (Election)
March 2024 Presidential Primary Election |
ePulse Download Results
Carrier | Result |
---|---|
ePulse results pending load test. |
Changes to Electrical
Add GeneratorAdd Spider Box
SSaLT Summary
Description | Quantity |
---|---|
Max BMDs Supported (power) | 135 |
Max BMDs Supported (outlets) | 135 |
Max ePollBooks Supported | Pending Load Test |
Site Survey Result | Passed |
Load Test Status | Pending |
Load Test Date | |
Cellular Result | |
Ethernet Result |
Electrical Survey Summary
Description | Value |
---|---|
Electrical Survey Date | 1/9/2024 |
Available Amperage | 118.30 |
Number of Working Outlets | 36 |
Number of Dead Outlets | 0 |
2 Prong (Type A) 15 Amp Outlets | 0 |
2 Prong (Type A) 20 Amp Outlets | 0 |
3 Prong (Type B) 15 Amp Outlets | 36 |
3 Prong (Type B) 20 Amp Outlets | 0 |
Electrical Surveyor | Eliah Ostrander |