SSaLT Results for Occidental College (11756)
Room Surveyed: Herrick Memorial Chapel-Interfaith Ctr
Cellular Measurements from Load Test
Carrier | Upload Speed | Download Speed |
---|---|---|
FirstNet 5G | 0.36 | 4.01 |
T-Mobile 5G | 1.03 | 17.04 |
Verizon 5G | 0.00 | 0.00 |
Ethernet (Speeds) | 436.92 | 493.33 |
Ethernet (Port) | 3 |
Uploaded Files
File Description | Upload Date | Uploaded By |
---|---|---|
Room Picture | 9/18/2024 | Patrick Igoe |
Diagram | 9/18/2024 | Patrick Igoe |
Data Jack | 9/23/2024 |
Last Used (Election)
March 2024 Presidential Primary Election |
ePulse Download Results
Carrier | Result |
---|---|
AT&T | Successful |
T-Mobile 5G | Successful |
Verizon 5G | Failed |
Ethernet (WAN) | Successful |
Changes to Electrical
Add GeneratorAdd Spider Box
SSaLT Summary
Description | Quantity |
---|---|
Max BMDs Supported (power) | 91 |
Max BMDs Supported (outlets) | 70 |
Max ePollBooks Supported | 246 |
Site Survey Result | Passed |
Load Test Status | Completed |
Load Test Date | 9/17/2024 |
Cellular Result | Cell (0) |
Ethernet Result | Successful |
Electrical Survey Summary
Description | Value |
---|---|
Electrical Survey Date | 9/17/2024 |
Available Amperage | 80.00 |
Number of Working Outlets | 16 |
Number of Dead Outlets | 0 |
2 Prong (Type A) 15 Amp Outlets | 0 |
2 Prong (Type A) 20 Amp Outlets | 0 |
3 Prong (Type B) 15 Amp Outlets | 16 |
3 Prong (Type B) 20 Amp Outlets | 0 |
Electrical Surveyor | Patrick Igoe |