SSaLT Results for Kenneth Hahn Hall of Administration (20938)
Room Surveyed:  2nd Floor Lobby
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed
FirstNet 5G 0.02 3.28
T-Mobile 5G 11.68 6.18
Verizon 5G 26.57 82.72
Ethernet (Speeds) 0.0 0.0
Ethernet (Port) n/a


Uploaded Files
File Description Upload Date Uploaded By
Room Picture9/24/2024Eliah Ostrander
Diagram9/24/2024Eliah Ostrander

A file has not been uploaded for this load test.


Last Used (Election)
November 2025 Statewide Special Election

 
ePulse Download Results
Carrier Result
AT&T Not Tested
T-Mobile 5G Not Tested
Verizon 5G Not Tested
Ethernet (WAN) Not Tested


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 68
Max BMDs Supported (outlets) 30
Max ePollBooks Supported 11
Site Survey Result Passed
Load Test Status Completed
Load Test Date 4/8/2026
Cellular Result Cell (3)
Ethernet Result Not Tested


Electrical Survey Summary
Description Value
Electrical Survey Date 9/23/2024
Available Amperage 60.00
Number of Working Outlets 8
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 2
3 Prong (Type B) 20 Amp Outlets 6
Electrical Surveyor Eliah Ostrander