SSaLT Results for Los Angeles Trade Technical College (20971)
Room Surveyed: Lib Arts Bldg Multi-Purpose Room F5-101
Cellular Measurements from Load Test
Carrier | Upload Speed | Download Speed |
---|---|---|
FirstNet 5G | 4.81 | 5.76 |
T-Mobile 5G | 3.7 | 5.1 |
Verizon 5G | 14.03 | 66.73 |
Ethernet (Speeds) | 593.9 | 811.9 |
Ethernet (Port) | switch |
Uploaded Files
File Description | Upload Date | Uploaded By |
---|---|---|
Room Picture | 10/2/2024 | Patrick Igoe |
Diagram | 10/2/2024 | Patrick Igoe |
switch | 10/2/2024 |
Last Used (Election)
2022 Statewide General Election |
ePulse Download Results
Carrier | Result |
---|---|
AT&T | Successful |
T-Mobile 5G | Successful |
Verizon 5G | Successful |
Ethernet (WAN) | Successful |
Changes to Electrical
Add GeneratorAdd Spider Box
SSaLT Summary
Description | Quantity |
---|---|
Max BMDs Supported (power) | 68 |
Max BMDs Supported (outlets) | 60 |
Max ePollBooks Supported | 14 |
Site Survey Result | Passed |
Load Test Status | Completed |
Load Test Date | 10/3/2024 |
Cellular Result | Cell (1) |
Ethernet Result | Successful |
Electrical Survey Summary
Description | Value |
---|---|
Electrical Survey Date | 10/2/2024 |
Available Amperage | 59.50 |
Number of Working Outlets | 14 |
Number of Dead Outlets | 0 |
2 Prong (Type A) 15 Amp Outlets | 0 |
2 Prong (Type A) 20 Amp Outlets | 0 |
3 Prong (Type B) 15 Amp Outlets | 0 |
3 Prong (Type B) 20 Amp Outlets | 14 |
Electrical Surveyor | Patrick Igoe |