SSaLT Results for Sorenson Library (13272)
Room Surveyed:  Meeting Room
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed
FirstNet 5G 9.0 149.0
T-Mobile 5G 9.0 115.0
Verizon 5G 0.0 0.0
Ethernet (Speeds) 0.0 0.0
Ethernet (Port) Southwest Wall - Under Wall Mounted TV


Uploaded Files
File Description Upload Date Uploaded By
Room Picture3/3/2026Rafael Meza
Diagram3/3/2026Rafael Meza
Data Jack Location 8/19/2026


Last Used (Election)
March 2020 Presidential Primary Election

 
ePulse Download Results
Carrier Result
AT&T Successful
T-Mobile 5G Successful
Verizon 5G Failed
Ethernet (WAN) Not Tested


Changes to Electrical
Add Generator
Remove Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 17
Max BMDs Supported (outlets) 17
Max ePollBooks Supported 9
Site Survey Result Mitigation Needed
Remediation Spider Box Required
Load Test Status Completed
Load Test Date 8/19/2026
Cellular Result Cell (4)
Ethernet Result Not Tested


Electrical Survey Summary
Description Value
Electrical Survey Date 3/2/2026
Available Amperage 15.00
Number of Working Outlets 20
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 0
3 Prong (Type B) 20 Amp Outlets 20
Electrical Surveyor Rafael Meza