SSaLT Results for Los Angeles Pierce College (13187)
Room Surveyed: Building 600
Cellular Measurements from Load Test
| Carrier | Upload Speed | Download Speed |
|---|---|---|
| FirstNet 5G | 27.99 | 95.12 |
| T-Mobile 5G | 31.82 | 30.61 |
| Verizon 5G | 1.53 | 131.13 |
| Ethernet (Speeds) | 93.44 | 87.27 |
| Ethernet (Port) | Floor-mount just west of Room 619 | |
Uploaded Files
| File Description | Upload Date | Uploaded By |
|---|---|---|
| Room Picture | 4/7/2026 | Rafael Meza |
| Diagram | 4/7/2026 | Rafael Meza |
| C06-BDF611E-C07 | 3/19/2026 |
Last Used (Election)
| November 2025 Statewide Special Election |
ePulse Download Results
| Carrier | Result |
|---|---|
| AT&T | Successful |
| T-Mobile 5G | Successful |
| Verizon 5G | Successful |
| Ethernet (WAN) | Successful |
Changes to Electrical
Add GeneratorAdd Spider Box
SSaLT Summary
| Description | Quantity |
|---|---|
| Max BMDs Supported (power) | 68 |
| Max BMDs Supported (outlets) | 68 |
| Max ePollBooks Supported | 27 |
| Site Survey Result | Passed |
| Load Test Status | Completed |
| Load Test Date | 3/19/2026 |
| Cellular Result | Cell (4) |
| Ethernet Result | Successful |
Electrical Survey Summary
| Description | Value |
|---|---|
| Electrical Survey Date | 4/6/2026 |
| Available Amperage | 60.00 |
| Number of Working Outlets | 24 |
| Number of Dead Outlets | 0 |
| 2 Prong (Type A) 15 Amp Outlets | 0 |
| 2 Prong (Type A) 20 Amp Outlets | 0 |
| 3 Prong (Type B) 15 Amp Outlets | 0 |
| 3 Prong (Type B) 20 Amp Outlets | 24 |
| Electrical Surveyor | Rafael Meza |