SSaLT Results for Occidental College (11756)
Room Surveyed: Herrick Memorial Chapel-Interfaith Ctr
Cellular Measurements from Load Test
| Carrier | Upload Speed | Download Speed |
|---|---|---|
| FirstNet 5G | 3.43 | 20.49 |
| T-Mobile 5G | 3.28 | 23.14 |
| Verizon 5G | 0.08 | 2.52 |
| Ethernet (Speeds) | 908.83 | 902.75 |
| Ethernet (Port) | Data Port on SW wall, A/V panel under projector screen, bottom r | |
Uploaded Files
| File Description | Upload Date | Uploaded By |
|---|---|---|
| Room Picture | 7/30/2026 | Rafael Meza |
| Diagram | 7/30/2026 | Rafael Meza |
| Data Jack | 7/29/2026 | |
| Data Jack | 7/29/2026 | |
| Data Jack | 7/29/2026 |
Last Used (Election)
| November 2024 General Election |
ePulse Download Results
| Carrier | Result |
|---|---|
| AT&T | Not Tested |
| T-Mobile 5G | Not Tested |
| Verizon 5G | Not Tested |
| Ethernet (WAN) | Successful |
Changes to Electrical
Add GeneratorAdd Spider Box
SSaLT Summary
| Description | Quantity |
|---|---|
| Max BMDs Supported (power) | 45 |
| Max BMDs Supported (outlets) | 45 |
| Max ePollBooks Supported | 451 |
| Site Survey Result | Passed |
| Load Test Status | Completed |
| Load Test Date | 7/29/2026 |
| Cellular Result | Cell (0) |
| Ethernet Result | Successful |
Electrical Survey Summary
| Description | Value |
|---|---|
| Electrical Survey Date | 7/29/2026 |
| Available Amperage | 40.00 |
| Number of Working Outlets | 18 |
| Number of Dead Outlets | 1 |
| 2 Prong (Type A) 15 Amp Outlets | 4 |
| 2 Prong (Type A) 20 Amp Outlets | 0 |
| 3 Prong (Type B) 15 Amp Outlets | 12 |
| 3 Prong (Type B) 20 Amp Outlets | 2 |
| Electrical Surveyor | Rafael Meza |