SSaLT Results for Christian Science Church-Malibu (14522)
Room Surveyed: Sunday School Building Reading Room
Cellular Measurements from Load Test
| Carrier | Upload Speed | Download Speed |
|---|---|---|
| FirstNet 5G | 0.0 | 0.0 |
| T-Mobile 5G | 1.59 | 19.46 |
| Verizon 5G | 0.0 | 0.0 |
| Ethernet (Speeds) | 487.66 | 471.35 |
| Ethernet (Port) | Data Port 4 on Netgear router on west wall computer desk | |
Uploaded Files
| File Description | Upload Date | Uploaded By |
|---|---|---|
| Room Picture | 8/3/2026 | John Navarrete |
| Diagram | 8/3/2026 | John Navarrete |
| Data Jack | 9/1/2026 |
Last Used (Election)
| November 2025 Statewide Special Election |
ePulse Download Results
| Carrier | Result |
|---|---|
| AT&T | Not Tested |
| T-Mobile 5G | Not Tested |
| Verizon 5G | Failed |
| Ethernet (WAN) | Successful |
Changes to Electrical
Add GeneratorAdd Spider Box
SSaLT Summary
| Description | Quantity |
|---|---|
| Max BMDs Supported (power) | 40 |
| Max BMDs Supported (outlets) | 40 |
| Max ePollBooks Supported | 235 |
| Site Survey Result | Passed |
| Load Test Status | Completed |
| Load Test Date | 9/1/2026 |
| Cellular Result | Cell (0) |
| Ethernet Result | Successful |
Electrical Survey Summary
| Description | Value |
|---|---|
| Electrical Survey Date | 7/31/2026 |
| Available Amperage | 35.30 |
| Number of Working Outlets | 10 |
| Number of Dead Outlets | 0 |
| 2 Prong (Type A) 15 Amp Outlets | 0 |
| 2 Prong (Type A) 20 Amp Outlets | 0 |
| 3 Prong (Type B) 15 Amp Outlets | 10 |
| 3 Prong (Type B) 20 Amp Outlets | 0 |
| Electrical Surveyor | John Navarrete |