SSaLT Results for Acton Agua Dulce Library (85)
Room Surveyed: Meeting Room
Cellular Measurements from Load Test
| Carrier | Upload Speed | Download Speed |
|---|---|---|
| FirstNet 5G | 0.0 | 29.0 |
| T-Mobile 5G | 2.0 | 31.0 |
| Verizon 5G | 46.0 | 226.0 |
| Ethernet (Speeds) | 295.0 | 12.0 |
| Ethernet (Port) | Meeting Room | |
Uploaded Files
| File Description | Upload Date | Uploaded By |
|---|---|---|
| Room Picture | 8/12/2026 | Jefferey Castillo |
| Diagram | 8/12/2026 | Jefferey Castillo |
| Data Jack RRC | 8/11/2026 | |
| Data Jack RRC | 8/11/2026 | |
| Data Jack RRC | 8/11/2026 |
Last Used (Election)
| November 2025 Statewide Special Election |
ePulse Download Results
| Carrier | Result |
|---|---|
| T-Mobile 5G | |
| Verizon 5G | |
| Ethernet (WAN) | Successful |
Changes to Electrical
Add GeneratorAdd Spider Box
SSaLT Summary
| Description | Quantity |
|---|---|
| Max BMDs Supported (power) | 160 |
| Max BMDs Supported (outlets) | 160 |
| Max ePollBooks Supported | 46 |
| Site Survey Result | Passed |
| Load Test Status | Completed |
| Load Test Date | 8/11/2026 |
| Cellular Result | Cell (3) |
| Ethernet Result | Successful |
Electrical Survey Summary
| Description | Value |
|---|---|
| Electrical Survey Date | 8/11/2026 |
| Available Amperage | 140.00 |
| Number of Working Outlets | 54 |
| Number of Dead Outlets | 0 |
| 2 Prong (Type A) 15 Amp Outlets | 0 |
| 2 Prong (Type A) 20 Amp Outlets | 0 |
| 3 Prong (Type B) 15 Amp Outlets | 0 |
| 3 Prong (Type B) 20 Amp Outlets | 54 |
| Electrical Surveyor | Jefferey Castillo |