SSaLT Results for Citrus College (14932)
Room Surveyed: Hayden Hall Room 101
Cellular Measurements from Load Test
| Carrier | Upload Speed | Download Speed |
|---|---|---|
| FirstNet 5G | 0.06 | 2.60 |
| T-Mobile 5G | 23.71 | 184.00 |
| Verizon 5G | 32.72 | 286.11 |
| Ethernet (Speeds) | 871.34 | 933.46 |
| Ethernet (Port) | NW corner of room - Labled 706-D-03 Middle Port | |
Uploaded Files
| File Description | Upload Date | Uploaded By |
|---|---|---|
| Room Picture | 8/27/2026 | Rafael Meza |
| Diagram | 8/27/2026 | Rafael Meza |
| Data Jack Location | 8/26/2026 |
Last Used (Election)
| November 2025 Statewide Special Election |
ePulse Download Results
| Carrier | Result |
|---|---|
| AT&T | Not Tested |
| T-Mobile 5G | Not Tested |
| Verizon 5G | Not Tested |
| Ethernet (WAN) | Successful |
Changes to Electrical
Add GeneratorAdd Spider Box
SSaLT Summary
| Description | Quantity |
|---|---|
| Max BMDs Supported (power) | 68 |
| Max BMDs Supported (outlets) | 68 |
| Max ePollBooks Supported | 32 |
| Site Survey Result | Passed |
| Load Test Status | Completed |
| Load Test Date | 8/26/2026 |
| Cellular Result | Cell (4) |
| Ethernet Result | Successful |
Electrical Survey Summary
| Description | Value |
|---|---|
| Electrical Survey Date | 8/26/2026 |
| Available Amperage | 60.00 |
| Number of Working Outlets | 34 |
| Number of Dead Outlets | 0 |
| 2 Prong (Type A) 15 Amp Outlets | 0 |
| 2 Prong (Type A) 20 Amp Outlets | 0 |
| 3 Prong (Type B) 15 Amp Outlets | 0 |
| 3 Prong (Type B) 20 Amp Outlets | 34 |
| Electrical Surveyor | Rafael Meza |