SSaLT Results for Los Angeles Trade Technical College (20971)
Room Surveyed: Lib Arts Bldg Multi-Purpose Room F5-101
Cellular Measurements from Load Test
| Carrier | Upload Speed | Download Speed |
|---|---|---|
| FirstNet 5G | 21.92 | 39.05 |
| T-Mobile 5G | 6.74 | 27.67 |
| Verizon 5G | 3.29 | 50.58 |
| Ethernet (Speeds) | 355.53 | 169.45 |
| Ethernet (Port) | VOIP phone on podium | |
Uploaded Files
| File Description | Upload Date | Uploaded By |
|---|---|---|
| Room Picture | 8/28/2026 | Jefferey Castillo |
| Diagram | 8/28/2026 | Jefferey Castillo |
| VOIP phone | 8/27/2026 |
Last Used (Election)
| November 2024 General Election |
ePulse Download Results
| Carrier | Result |
|---|---|
| AT&T | Not Tested |
| T-Mobile 5G | Not Tested |
| Verizon 5G | Not Tested |
| Ethernet (WAN) | Successful |
Changes to Electrical
Add GeneratorAdd Spider Box
SSaLT Summary
| Description | Quantity |
|---|---|
| Max BMDs Supported (power) | 68 |
| Max BMDs Supported (outlets) | 50 |
| Max ePollBooks Supported | 27 |
| Site Survey Result | Passed |
| Load Test Status | Completed |
| Load Test Date | 8/27/2026 |
| Cellular Result | Cell (5) |
| Ethernet Result | Successful |
Electrical Survey Summary
| Description | Value |
|---|---|
| Electrical Survey Date | 8/27/2026 |
| Available Amperage | 60.00 |
| Number of Working Outlets | 12 |
| Number of Dead Outlets | 0 |
| 2 Prong (Type A) 15 Amp Outlets | 0 |
| 2 Prong (Type A) 20 Amp Outlets | 0 |
| 3 Prong (Type B) 15 Amp Outlets | 0 |
| 3 Prong (Type B) 20 Amp Outlets | 12 |
| Electrical Surveyor | Jefferey Castillo |