SSaLT Results for Lou Costello Recreation Center (590)
Room Surveyed:  Senior Center
   

   
Cellular Measurements from Load Test
Carrier Upload Speed Download Speed
FirstNet 5G 0.02 4.0
T-Mobile 5G 0.0 0.0
Verizon 5G 2.0 33.0
Ethernet (Speeds) 0.0 0.0
Ethernet (Port) Closet behind water heater closet


Uploaded Files
File Description Upload Date Uploaded By
Room Picture9/2/2026Rafael Meza
Diagram9/2/2026Rafael Meza
Network closet9/1/2026


Last Used (Election)
November 2024 General Election

 
ePulse Download Results
Carrier Result
AT&T Failed
T-Mobile 5G Failed
Verizon 5G Successful
Ethernet (WAN) Not Tested


Changes to Electrical
Add Generator
Add Spider Box
 
SSaLT Summary
Description Quantity
Max BMDs Supported (power) 45
Max BMDs Supported (outlets) 45
Max ePollBooks Supported 0
Site Survey Result Passed
Load Test Status Completed
Load Test Date 9/1/2026
Cellular Result Cell (0)
Ethernet Result Not Tested


Electrical Survey Summary
Description Value
Electrical Survey Date 9/1/2026
Available Amperage 40.00
Number of Working Outlets 12
Number of Dead Outlets 0
2 Prong (Type A) 15 Amp Outlets 0
2 Prong (Type A) 20 Amp Outlets 0
3 Prong (Type B) 15 Amp Outlets 12
3 Prong (Type B) 20 Amp Outlets 0
Electrical Surveyor Rafael Meza